ARKEMA wall design of the PIERRE-BENITE industrial complex

Context

The Arkema chemical plant of Pierre-Bénite and Greater Lyon wanted to embellish a large industrial site at the south entrance to Lyon with the production by CitéCréation of frescos on the theme of chemistry.
This gigantic work over a kilometre long and with a surface area of 2,500 m² participates in upgrading what is called the Chemical Valley bordering the A7 highway.

 

Chemicals in all their states

It’s a beautiful way to make Arkem’a knowhow visible. The fresco illustrates the economic dynamism of our territory and it’s an astute and aesthetic way to underline the competences and knowhow of the company’s employees.
Serge Tarassioux
Deputy Mayor of Pierre Bénite, responsible for business and urban development.
Contracting owner : Arkema.
Place : Pierre-Bénite – A7 highway- south entrance to Lyon / France.
Contracting owner : Arkema.
Place : Pierre-Bénite – A7 highway- south entrance to Lyon / France.
Contracting owner : Arkema.
Place : Pierre-Bénite – A7 highway- south entrance to Lyon / France.
Contracting owner : Arkema.
Place : Pierre-Bénite – A7 highway- south entrance to Lyon / France.

Curious to know more?

The problem

One kilometre long and seen by 17 million car drivers every year, the perimeter wall of the chemical plant of Pierre-Bénite was covered in graffiti. The wall projected a very negative image with a feeling of insecurity, especially since the plant is a Seveso classified site.

Action / result

The work done with the management and employees of the plant in several co-creation workshops led to the pedagogical concept of making the chemical activity of Arkema accessible to the greatest number. Then the colourful design produced with graffiti artists from Berlin enhanced the image of Arkema’s activity while catching the eyes of drivers on the A7 highway.

The actors of the project

  • Contracting owner: Arkema.
  • Project manager: CitéCréation.

Budget et Technique

Cost of the monumental mural design project:

  • Project coordination/ Design / Production of the overall design.
  • €90 K ex. tax*.
  • Timetable for carrying out the project: 6 months.

Technical characteristics of the painted facades:

  • Prefabricated concrete wall.

*Excluding scaffolding, surface preparation, team facilities, site office with access to water.

Photos